Sunday, August 28, 2016

THE NEW ENGLAND CONVENTION

There has been some action at the C Depot construction site with the Transformer platform completed as far as possible .Until the base is installed in the module ,which will be after the display at the
Armidale Convention  in November.

Link To Registration
http://www.newenglandmodelrailwayclub.com/content/convention.shtml

So its basically finished !

                                                 TRANSFORMER  & PLATFORM


                                     ELEVATOR TOWER AND GRAIN RECEIVALS  SHED


                                      OUT LOADER IN EXTENDED POSITION









                                                   OUT LOADER IN STOWED POSITION



                      I will also  have the sections of ASHFORD -- MUNGINDI  extension on display
                     to demonstrate the steel frame foam scenery method . And the method for turning
                     a commercial tree into the gums in this river scene.And some other bits and pieces.